Well folks, some of you may be aware we had an issue with the transporter on route to our lib site in St Pol.
Approximately 40 minutes into the journey the issue arose, and the lorry started to overheat. After cooling down and being topped up we had to make our way back to a liberation site in Cherbourg. With the help of our agent Thomas Byrne at the Rosscoff site he put us in contact with the Cherbourg RPRA agent. He met us here on the Cherbourg site and will be able to assist us and sign off the paperwork for the liberation. I can assure everyone that your birds have been looked after very well, they were fed and had water in front of them on the boat for the entire 19-hour crossing. The water was removed for the journey for two hours until back on site here at Cherbourg where drinkers were topped up again. That’s an exact account of what has happened despite any rumours or innuendo that you may hear regarding the race. I will update u all in the morning.
Regards
Desy